pgarner
TC ModFather
THIS THREAD IS A CONTINUATION OF THIS THREAD
not very much its more a case of stripping out the ashtray and making something the same size, looking at using stretched fleece to make the starting mould, then could use the CSM inside it and tissue on the outside for a smoother finish. a square meter would more than enough.
not sure what ill need for the parcel shelf, properly 4 meters, not sure if i even want to CF it now as itll stand out and im trying to keep it OEM looking.
not very much its more a case of stripping out the ashtray and making something the same size, looking at using stretched fleece to make the starting mould, then could use the CSM inside it and tissue on the outside for a smoother finish. a square meter would more than enough.
not sure what ill need for the parcel shelf, properly 4 meters, not sure if i even want to CF it now as itll stand out and im trying to keep it OEM looking.